We are independent & ad-supported. We may earn a commission for purchases made through our links.
Advertiser Disclosure
Our website is an independent, advertising-supported platform. We provide our content free of charge to our readers, and to keep it that way, we rely on revenue generated through advertisements and affiliate partnerships. This means that when you click on certain links on our site and make a purchase, we may earn a commission. Learn more.
How We Make Money
We sustain our operations through affiliate commissions and advertising. If you click on an affiliate link and make a purchase, we may receive a commission from the merchant at no additional cost to you. We also display advertisements on our website, which help generate revenue to support our work and keep our content free for readers. Our editorial team operates independently of our advertising and affiliate partnerships to ensure that our content remains unbiased and focused on providing you with the best information and recommendations based on thorough research and honest evaluations. To remain transparent, we’ve provided a list of our current affiliate partners here.
Construction

Our Promise to you

Founded in 2002, our company has been a trusted resource for readers seeking informative and engaging content. Our dedication to quality remains unwavering—and will never change. We follow a strict editorial policy, ensuring that our content is authored by highly qualified professionals and edited by subject matter experts. This guarantees that everything we publish is objective, accurate, and trustworthy.

Over the years, we've refined our approach to cover a wide range of topics, providing readers with reliable and practical advice to enhance their knowledge and skills. That's why millions of readers turn to us each year. Join us in celebrating the joy of learning, guided by standards you can trust.

In Concrete Construction, what is a Cold Joint?

By Kirsten C. Tynan
Updated: May 17, 2024
Views: 66,325
Share

A cold joint is an undesirable discontinuity between layers of concrete that occurs when one layer of concrete is allowed to harden before the rest of the concrete is poured in what is meant to be a single, solid mass. The discontinuity occurs between the layers due to the inability of the freshly poured, wet concrete to intermix with and bind properly to the hardened concrete. Such a discontinuity is often the result of logistical issues such as a contractor’s work schedule or an unexpected material shortage.

Problems associated with cold joints range from the relatively minor to the very serious. At the less serious end of the spectrum, a cold joint may result in a visually unappealing discontinuity that is visible on the surface once the concrete has hardened. This kind of aesthetic defect may simply be concealed rather than repaired.

A more serious problem associated with a cold joint is the possibility of moisture intrusion into the concrete section. If water settles in the joint, it may lead to degradation of the concrete under certain environmental conditions. For example, as water expands when it freezes and then contracts when it melts, water trapped in a cold joint may cause cracking or erosion of the material. Moisture may also damage other things beyond the concrete mass if it is able to seep all the way through it.

Additionally, a cold joint is an area of compromised strength. Concrete is notable for its high strength under compression, but it is much weaker under tension. A cold joint is even weaker under tension, and it is susceptible to shearing at the discontinuity.

Whenever possible, these joints should be avoided in concrete construction by completing the entire pour for a given section in one session. This allows the entire section to harden in a continuous, solid mass. If this is not possible, several steps can be taken to mitigate the more serious problems.

Specialized waterproofing joint sealant may be applied to the joint to make it watertight, thereby protecting against potentially damaging moisture intrusion. A special surface preparation may be applied to the hardened layer before applying a fresh layer of concrete. This will strengthen the bond between the two layers. Another way to increase the strength of the cold joint is to insert reinforcing bar, or rebar, into the first layer before pouring the next layer. This will better help tie them together and increase the tensile strength of the joint. It is also sometimes possible to locate the weakened joint in an area that is not critical to supporting a large load.

Share
About Mechanics is dedicated to providing accurate and trustworthy information. We carefully select reputable sources and employ a rigorous fact-checking process to maintain the highest standards. To learn more about our commitment to accuracy, read our editorial process.
Discussion Comments
By Markerrag — On Feb 01, 2014

A cold joint can be a lot more than the result of a contractor's work schedule or a material shortage -- it can be caused by cut rate, quick job scammers who don't know what they're doing. Be careful when hiring professionals to do a job. If they don't have some references, there's probably a reason for that.

Share
https://www.aboutmechanics.com/in-concrete-construction-what-is-a-cold-joint.htm
Copy this link
About Mechanics, in your inbox

Our latest articles, guides, and more, delivered daily.

About Mechanics, in your inbox

Our latest articles, guides, and more, delivered daily.